Space News from SpaceDaily.com
Press Release from Business Wire: NHOA Energy
(AFP) Feb 13, 2026
MILAN, Feb 13, 2026 (BSW) - NHOA Energy, global provider of utility-scale energy storage systems, today marked together with EnergyAustralia and Enerven the official project launch of a 245 MWh Battery Energy Storage System (BESS) in Hallett, near the town of Canowie, in South Australia, following the achievement of financial close and the project's transition into the delivery phase.

The milestone was announced today during a project launch ceremony held at the Hallett Power Station, attended by representatives of EnergyAustralia, Enerven, NHOA Energy, government, Traditional Owners and local community stakeholders.

Owned and developed by EnergyAustralia, the Hallett BESS is being built alongside the existing Hallett gas-fired power station and represents the first stage of a broader site development. As delivery partner for Stage 1 of the project, NHOA Energy will supply a Battery Energy Storage System delivering 245 MWh of guaranteed usable energy capacity (50 MW with five hours of storage) at Beginning of Life.

The system is designed as a grid-forming solution capable of providing essential stability services to the National Electricity Market (NEM), including frequency control, grid support, energy arbitrage and participation in NEM market services, strengthening the resilience of South Australia's power system while enabling the continued integration of renewable energy. Hallett BESS leverages existing infrastructure at the Hallett Power Station, minimising the need for new transmission works and reducing land and environmental impacts. Integration of the battery with a live operating energy site is enabled by NHOA Energy's proprietary PROPHET control platform, supporting safe, reliable and coordinated operation of the combined assets.

The project has secured backing under the Australian Government's Capacity Investment Scheme (CIS), a framework designed to reduce investment risk and accelerate the deployment of clean, dispatchable energy capacity, including large-scale battery storage.

Daniel Nugent, Trading and Transition Executive at EnergyAustralia, commented, "By building the battery at Hallett, we're making use of infrastructure that is already there, supporting local jobs and strengthening South Australia's power system at the same time. Financial close means this project is real, funded and now being built and our focus now shifts squarely to disciplined execution and delivery."

"We are proud to support EnergyAustralia in a project that combines advanced grid-forming technology with a strong institutional framework such as the Capacity Investment Scheme, while making smart use of existing infrastructure," said Adrian Marziano, VP Australia & Pacific at NHOA Energy, speaking at the official project launch ceremony. "The Hallett BESS represents another important step in strengthening the resilience of the Australian power system while enabling the continued integration of renewable energy."

Commissioning is expected to begin in January 2027, in line with the project's development and testing milestones.

* * *

NHOA Energy

NHOA Energy delivers world-class energy storage technology, engineering and service, enabling secure and affordable power systems based on renewable energy sources. It is a pioneer in energy storage for utility-scale and industrial applications, building its leadership and competitive advantage on innovation, human capital and sustainability along with organizational excellence and financial strength. NHOA Energy operates globally, with four regional headquarters in Milan, Taipei, Perth and Houston.

For more information, visitwww.nhoa.energy

Follow us on LinkedIn



View source version on businesswire.com: https://www.businesswire.com/news/home/20260212570742/en/




Contact

Communications: Teresa Pogliani, +39 340 464 9719, [email protected]



© 2026 Business Wire, Inc.Disclaimer:This press release is not a document produced by AFP. AFP shall not bear responsibility for its content. In case you have any questions about this press release, please refer to the contact person/entity mentioned in the text of the press release.


ADVERTISEMENT




Space News from SpaceDaily.com
NASA Stennis proves water systems ready for Artemis IV upper stage trials
China verifies Long March 10 booster splashdown and crew escape in key lunar test
Stoke Space expands Series D funding to $860M to drive Nova launch development

24/7 Energy News Coverage
Latvian startup advances nuclear-fueled power for satellites and future Moon missions
Quantum team reads information from robust Majorana qubits using quantum capacitance
Photonic neurons push ultra-fast trading beyond electronic limits

Military Space News, Nuclear Weapons, Missile Defense
Raytheon demonstrates recoverable Coyote system against drone swarms
The Decline and Fall of Donald Trump
'Greenland moment': Macron urges Europe to invest in strategic sectors

24/7 News Coverage
Southern Indian Ocean waters lose salt as climate shifts currents
Course correction needed quickly to avoid pathway to 'hothouse Earth' scenario, scientists say
Ancient trilobite shells reveal durable chitin and long term carbon storage


All rights reserved. Copyright Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.