Space News from SpaceDaily.com
NASA chief rules out March launch of Moon mission over technical issues
Washington, United States, Feb 21 (AFP) Feb 21, 2026
NASA chief Jared Isaacman on Saturday ruled out a March launch for Artemis 2, the first crewed flyby mission to the Moon in more than 50 years, citing technical issues.

Workers detected a problem with helium flow to the massive SLS rocket that will "take the March launch window out of consideration," Issacman said in a post on X.

"I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor," Isaacman said.

"During the 1960s, when NASA achieved what most thought was impossible, and what has never been repeated since, there were many setbacks."

The towering SLS rocket and Orion spacecraft will be rolled back into the Vehicle Assembly Building at the Kennedy Space Center in Florida to investigate the technical issues and make any necessary repairs, Isaacman said.

A complete briefing will follow in the coming days, he added.

The highly anticipated Artemis 2 mission, lasting about 10 days, will see three Americans and one Canadian fly around Earth's satellite.

It would be a huge step towards Americans once again setting foot on the lunar surface, a goal announced by President Donald Trump in his first term.

On Friday, NASA had set March 6 as the earliest possible launch date.

The US space agency hopes to put humans back on the Moon as China forges ahead with a rival effort that is targeting 2030 at the latest for its first crewed mission.

China's uncrewed Chang'e 7 mission is expected to be launched in 2026 for an exploration of the Moon's south pole, and testing of its crewed spacecraft Mengzhou is also set to go ahead this year.

NASA surprised many late last year when it said Artemis 2 could happen as soon as February -- an acceleration explained by the Trump administration's wish to beat China to the punch.

But the program has been plagued by delays.

The uncrewed Artemis 1 mission took place in November 2022 after multiple postponements and two failed launch attempts.

Then technical problems in early February -- which included a liquid hydrogen leak -- cut short a so-called wet dress rehearsal for the Artemis 2 launch. That was finally completed earlier this week.

The wet dress rehearsal was conducted under real conditions -- with full rocket tanks and technical checks -- at Cape Canaveral in Florida, with engineers practicing the maneuvers needed to carry out an actual launch.

NASA is hoping that the Moon could be used to help prepare future missions to Mars.


ADVERTISEMENT




Space News from SpaceDaily.com
Study revisits chances of detecting alien technosignatures
Hypersonica completes milestone hypersonic missile flight test in Norway
NASA teams set for second Artemis II wet dress rehearsal

24/7 Energy News Coverage
US renews threat to leave IEA
Environmental groups sue Trump administration over scrapped climate rule
Turkey fires up coal pollution even as it hosts COP31

Military Space News, Nuclear Weapons, Missile Defense
Facing US warnings, Iran defends right to nuclear enrichment
Airbus says will back two new European fighter jets 'if clients request'
US to withdraw all troops from Syria: reports

24/7 News Coverage
'Unprecedented' emissions maps will hone mitigation
Sudan's historic acacia forest devastated as war fuels logging
Deadly Indonesia floods force a deforestation reckoning


All rights reserved. Copyright Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.