|
. | . |
|
by Staff Writers Kourou, French Guiana (ESA) May 22, 2015
Another Ariane 5 has completed its initial build-up at the Spaceport in French Guiana, marking a major milestone in preparations for Arianespace's third heavy-lift mission of 2015 - which will orbit the European MSG-4 meteorological satellite and Brazilian Star One C4 telecommunications relay platform during July. As part of regular pre-flight preparations inside the Spaceport's Launcher Integration Building, the vehicle's core cryogenic stage was first removed from its protective shipping container and hoisted into position over one of two operational mobile launch tables available for Ariane 5. During separate rollout processes, the vehicle's two solid propellant boosters subsequently were then moved via rail on pallets from their dedicated on-site assembly facility to the Launcher Integration Building, and then mated with the core stage. To complete the current phase of assembly activity, Ariane 5's ESC-A cryogenic upper stage and vehicle equipment bay were installed yesterday as a single unit atop the Ariane 5's cryogenic core stage.
Continuing the 2015 flight cadence Flight VA224 is one of three missions currently undergoing preparations in parallel at the Spaceport, joining Flight VA223 - which will orbit the DirecTV-15 and SKY Mexico-1 satellites on May 27 using an Ariane 5; and Vega Flight VV05 with the Sentinel-2A Earth observation satellite for Europe's ambitious Copernicus initiative - which is scheduled to lift off this summer. With the Flight VA224 Ariane 5's initial build-up concluded, the launcher is now being readied for its transfer to the Spaceport's Final Assembly Building - where it will be fitted with the MSG-4 and Star One C4 satellite passengers. Eumetsat's MSG-4 meteorological satellite will join four other Meteosat-series platforms that currently are operational in geostationary orbit at 36,000 km. above the equator. After launch, it is to be stored in orbit, ultimately being named Meteosat-11. When operational, it will bridge the gap between Meteosat-10 (launched in 2012 by Arianespace) and the initial Meteosat Third Generation spacecraft - which are scheduled to be orbited in 2019 and 2021. MSG-4 was built by a Thales Alenia Space-led European consortium. The Star One C4 co-passenger - produced by SSL (Space Systems/Loral) - is a part of the third generation of Embratel Star One satellites, which ensure the continuity of telephone, television, radio, data transmission and Internet services in Brazil, in addition to expanding these services to Latin American countries and mainland United States.
Related Links Arianespace Launch Pad at Space-Travel.com
|
|
The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service. |