. 24/7 Space News .
ISS Orbit Adjusted To Host Shuttle Endeavor

Flight Readiness Review to Begin Wednesday
As launch preparations continue for the STS-118 mission, NASA managers will gather at Kennedy Space Center in Florida on Wednesday for the flight readiness review. During the two-day meeting, officials will evaluate the status of the vehicle, crew and payload and decide whether Space Shuttle Endeavour and STS-118 are officially "go" for launch. Last week, the crew members completed the terminal countdown demonstration test. A routine element of prelaunch training, the test allowed the astronauts to try on their launch and entry suits, learn emergency procedures at the launch pad, and take part in a variety of familiarization activities and briefings. The test concluded with a countdown dress rehearsal at Launch Pad 39A. Space Shuttle Endeavour has been in place at the launch pad since July 11, and the STS-118 payload -- including the S5 truss, SPACEHAB module and external stowage platform 3 -- is secured inside the orbiter's payload bay. Launch is targeted for the evening of August 7
by Staff Writers
Moscow (SPX) Jul 25, 2007
Russian Mission Control said Tuesday it successfully adjusted the International Space Station's orbit in preparation for the docking of the U.S. space shuttle Endeavor, due to be launched August 8. Corrections to the space station's orbit are conducted periodically before launches of Russian cargo ships and U.S. shuttles to compensate for Earth's gravity and to ensure successful dockings. The correction started at 2:06 a.m. Moscow time (10:06 p.m. GMT Monday) with the help of the Progress M-60 cargo ship, which is already docked with the ISS.

The cargo ship's boosters were activated for 1,265 seconds (about 21 minutes), while the orbit was raised 7.5 kilometers (4.7 miles), bringing the space station to an altitude of 337.5 kilometers (about 210 miles) over the Earth's surface.

"The correction was made without the crew's participation," a Mission Control's spokesman said.

The launch of the NASA STS-118 mission is targeted for August 8. It will be the 22nd flight to the International Space Station (ISS) and the first flight for Endeavour since 2002.

Endeavour, which has been modernized and equipped with a new system designed to let the shuttle use electrical power from the space station, will deliver a new truss segment, a Spacehab module, and an external stowage platform to the ISS, which is planned to be completed by 2010.

NASA said that during the 11-day mission, the seven-member Endeavour crew would conduct three space walks. An electrical boost from the space station could allow the mission to be extended for three extra days, and an additional spacewalk could be added.

The Endeavor is already being prepared for its rollout to the launch pad.

Community
Email This Article
Comment On This Article

Related Links
STS-118 at NASA
Space Station News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Station Crew Completes Successful Spacewalk
Houston TX (SPX) Jul 24, 2007
Two International Space Station crew members Monday successfully wrapped up a 7-hour, 41-minute spacewalk that saw the removal and jettison of a refrigerator-size ammonia reservoir. The spacewalk from the Quest Airlock ended at 2:06 p.m. EDT. Astronaut Clay Anderson was the lead spacewalker, EV1, wearing the spacesuit with red stripes.







  • Congress Examines Challenges Facing Shuttle And Station Programs
  • Space Adventures Secures Seats On The Soyuz
  • Washington Conference To Examine Impact Of Civilian Space Travel On Culture And Economy
  • First Malaysian Astronaut To Take Off For Space Station October 10

  • Digging Deep For Martian Life
  • Creating Martian Clay
  • Opportunity Calls Home After Some Solar Juice Cranks Up The Batteries
  • NASA Robots Practice Moon Survey In The Arctic Circle

  • Russian Space Firm Signs 14 Deals For Commercial Rocket Launches
  • Spaceway 3 Is Delivered To The Spaceport For Its Mid-August Ariane 5 Launch
  • Sea Launch To Resume Zenit Launches In October
  • Russia Proton-M Booster Puts US Satellite Into Orbit

  • Campaign Prepares For Future Land-Surface Monitoring
  • DMCii Wins ESA Satellite Imaging Contract
  • Envisat Captures Breath Of Volcano
  • NASA Awards Contract For Land-Imaging Instrument

  • Charon: An Ice Machine In The Ultimate Deep Freeze
  • New Horizons Slips Into Electronic Slumber
  • Nap Before You Sleep For Your Cruise Into The Abyss Of Outer Sol
  • The Dwarf Planet Known As Eris Is More Massive Than Pluto

  • Interstellar Chemistry Gets More Complex With New Charged-Molecule Discovery
  • First Pulsar Detection With LOFAR Station
  • Astronomers Find The Most Distant Known Galaxies
  • The Gobbling Dwarf That Exploded

  • Throttling Back To The Moon
  • Moonshine Can Reflect Lunar Composition
  • Northrop Grumman Helps NASA Shape Plans For Affordable Lunar Lander
  • Summer Moon Illusion

  • Navtrak GPS Fleet Tracking Services Added To InfoLogix Mobility Solution Suite
  • Nokia Makes Finding Yourself Faster With New A-GPS Service
  • Poplar Creek Installs ProLink ProStar GPS To Enhance Golfer Experience And Deliver Advertising Revenues
  • SANYO Easy Street Portable Navigation Systems Make Their Debut

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2007 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement