Subscribe free to our newsletters via your
. 24/7 Space News .




AEROSPACE
Extreme testing for rotor blades
by Staff Writers
Munich, Germany (SPX) Apr 29, 2011


The new facility will enable the institute's engineers to perform load tests on rotor blades measuring up to 90 meters in length. Credit: Fraunhofer IWES

Only when you are standing beside a wind turbine can you appreciate the immense size of the wind turbine and its rotor blades. The largest wind turbines operating in the world today have rotor blades over 60 meters long - roughly equivalent to three truck-and-trailer units end-to-end.

Within the next ten years, manufacturers of high-output wind turbines for offshore wind farms plan to produce blades up to 90 meters long. The prototypes of these new blades have to be tested and certified before they can go into production, and that requires equally as large testing facilities.

The Fraunhofer Institute for Wind Energy and Energy System Technology (IWES) in Bremerhaven is preparing for these outsized rotor blades. In early summer IWES will be inaugurating a new facility with the capability of testing rotor blades up to 90 meters long.

The central feature of the new test facility will be a tiltable 1000 metric tons steel and reinforced concrete mounting block. Hydraulic cylinders used to tilt the block and additional cylinders to load the blade will allow the IWES engineers to bend a rotor blade as easily as a finger to a blade of grass.

Preparations for testing begin by firmly mounting the flange of the rotor blade to the tilt block while the tip of the rotor blade projects upwards at a slight angle. Loading cables are attached at various locations along the blade and to hydraulic cylinders mounted on the floor. When all the cables and hydraulic cylinders are in place, the loading and tilting are initiated.

As the tilt block is rotated and the tip of the blade begins to move upward, the rotor blade bends as its upward movement is counteracted by the loading cables pulling downwards. This unique testing setup allows for the blade tip of 90 meter blades to be bent through a distance of 25 meters.

The IWES researchers and engineers will be building upon their prior rotor blade testing experience with the new 90 meter testing facility. A test facility for rotor blades up to 70 meters long was opened at IWES in Bremerhaven in 2009, but it is not equipped with a tiltable mounting block.

"The big advantage of the hydraulic tiltable mounting block is that it allows us to set up the ideal configuration for conducting tests with high precision in a minimum amount of time," says Falko Burkner, who leads the rotor-blade testing team at IWES.

This is especially important when testing the blades under extreme conditions, which involves subjecting the blades to the maximum theoretical loading it has been designed to withstand, i.e. 100% of the design load. This is always an anxious moment for the manufacturer: are our calculations accurate, is the structure robust enough?

The new test facility is not solely devoted to extreme load testing, but is also outfitted to simulate the cyclic forces acting on the rotor blades as they rotate due to the force of the wind. The wind and in turn rotation of the turbine causes constantly changing forces to act on the carbon or glass fiber reinforced materials of the rotor blades.

"There is no other engineered rotating system in which the materials must support so many changes in the load parameters," says Burkner.

This fatigue loading is simulated in the new facility by a hydraulic cylinder which alternately pushes and pulls on the blade, causing it to vibrate at its horizontal and/or vertical resonant frequencies. A full series of extreme load and endurance tests takes around four months to complete.

During this time, the blade is subjected to the same loads that it would normally have to withstand in 20 years of operation. Burkner is confident that the new facilities will enable the institute to continue its mission well into the future. "We have a full schedule for the next twelve months - and that is even before the new test hall opens on June 9, 2011."

IWES experts will be present at the Hannover Messe on April 4-8, 2011 (Hall 27, Stand H 24) to present a 3-D film of their biaxial rotor-blade testing and provide information for other new testing options. An open day for members of the public will be held at the new rotor-blade test center on June 11, 2011.

.


Related Links
Fraunhofer-Gesellschaft
Aerospace News at SpaceMart.com






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








AEROSPACE
Brazil's key airports set to go private
Brasilia, Brazil (UPI) Apr 28, 2011
Security and management of Brazil's key airports are likely to go under private management follow a government decision to push forward aviation development ahead of the 2014 World Cup and 2016 Olympics. Former President Luiz Inacio Lula da Silva's government launched ambitious plans to modernize the country's major airport in preparation for the two major sport events with an eye on pr ... read more


AEROSPACE
BRP To Contribute To Canadian Moon And Mars Exploration Programs

Naveen Jain Co-Founder And Chairman Of Moon Express

Project Morpheus To Begin Testing At NASA's Johnson Space Center

NASA Announces Winners Of 18th Annual Great Moonbuggy Race

AEROSPACE
NASA Orbiter Reveals Big Changes in Mars' Atmosphere

Dry ice find hints Mars was a wetter place: study

A Tale Of Two Deserts

Mars Rover's 'Gagarin' Moment Applauded Exploration

AEROSPACE
Voyager - The Love Story

Voyager Set to Enter Interstellar Space

First Cuban cosmonaut receives award from Russian government

$53 million pledged to Kickstarter in two years

AEROSPACE
China to attempt first space rendezvous

Countdown begins for Chineses space station program

Asia's star ever brighter in space

What Future for Chang'e-2

AEROSPACE
Russia ferries supplies to space

ESA prepares Soyuz for dry roll-out

NASA Receives European Commitment To Continue ISS

Cargo Craft Launches as Crew Prepares for Space Shuttle

AEROSPACE
Arianespace to launch ABS-2 in 2013

GSAT-8 put through its paces

Ariane Ariane 5 enjoys second successful launch for 2011

Ariane rocket launches two telecoms satellites

AEROSPACE
Tuning Into ExoPlanet Radio

The Shocking Environment Of Hot Jupiters

Radio signals could 'tag' distant planets

Titan-Like Exoplanets

AEROSPACE
Thousands queue for iPad 2 across Asia

New polymer structures for use as plastic electronics

NIST nanomagnets offer food for thought about computer memories

Chip satellites depart on Endeavour's final launch




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement