. 24/7 Space News .
Gravity Probe B Powered Up And OK

gravity in action
Huntsville - Apr 26, 2004
Gravity Probe B � a NASA mission to test two predictions of Albert Einstein's Theory of General Relativity � is orbiting 400 miles above Earth, and all spacecraft systems are performing well. Its solar arrays are generating power, and all electrical systems are powered on.

The spacecraft is communicating well with its supporting satellite relay and ground stations. Launched April 20 from Vandenberg Air Force Base, Calif., Gravity Probe B is managed by the Marshall Center.

At 9:57:24 am Pacific Daylight Time on Tuesday, April 20, 2004, the Gravity Probe B spacecraft had a picture-perfect launch from Vandenberg Air Force Base in South-central California. The Boeing Delta II rocket hit the exact center of the bull's eye in placing the spacecraft in its target polar orbit, 400 miles above the Earth.

"The Gravity Probe B Mission Operations Team has performed very well during this critical spacecraft activation period," said Tony Lyons, Gravity Probe B NASA Deputy Program Manager from Marshall Space Flight Center in Huntsville, Ala.

"We're ecstatic," said Stanford Gravity Probe B Program Manager, Gaylord Green. "We couldn't have asked for a better or more beautiful launch-nor a more perfect orbit insertion."

At approximately one hour eleven minutes, the spacecraft's solar arrays deployed, and shortly thereafter, the on-board cameras treated all viewers, via NASA TV, to the extraordinary sight of the separation of the spacecraft from the second stage rocket, with a portion of the Earth illuminated in the background.

After two days in orbit, all Gravity Probe B systems are performing as planned. The solar arrays are generating power, and all electrical systems are powered on. The spacecraft is communicating well with the Tracking and Data Relay Satellite System (TDRSS) and supporting ground stations.

All four Gyro Suspension Systems have now been activated. In addition, a lift check was successfully accomplished for gyros #2 and #3. "We've successfully achieved the first of many upcoming steps in preparing these four gyroscopes for science data collection," said Rob Brumley, Stanford Gravity Probe B Deputy Program Manager, Technical.

"We are all extremely gratified with the initial performance of these gyroscopes in space, including the first ever levitation of a Gravity Probe B gyro on orbit."

The spacecraft's Attitude Control System is maintaining initial attitude control. Fine attitude control should be achieved when thruster calibrations have been completed. After that, the ultra-precise science telescope will be locked onto the Gravity Probe B guide star, I'm Pegasi, to within a range of 1/100,000th of a degree.

"All of us on the GP-B team are very grateful for the tremendous support we have received from NASA, Lockheed Martin, Boeing, and many others," said Francis Everitt, Gravity Probe B Principal Investigator at Stanford University. "We're off to a fine start, but we now have a great sense of responsibility to make sure we do the science in the best possible way."

The spacecraft is being controlled from the Gravity Probe B Mission Operations Center, located at Stanford University. The Initialization & Orbit Checkout (IOC) phase of the Gravity Probe B mission is planned to last 45-60 days, after which the 12-month science data collection will begin. This will be followed by a two-month final calibration of the science instrument assembly.

NASA's Gravity Probe B mission, also known as GP-B, will use four ultra-precise gyroscopes to test Einstein's theory that space and time are distorted by the presence of massive objects. To accomplish this, the mission will measure two factors -- how space and time are warped by the presence of the Earth, and how the Earth's rotation drags space-time around with it.

Related Links
Gravity Probe B
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express

Delta 2 Breaks Free Of Gravity
Vandenberg - Apr 20, 2004
NASA's Gravity Probe B (GP-B) space vehicle, built, integrated and tested by Lockheed Martin, roared into space this morning from Vandenberg Air Force Base, Calif. Stanford University is the GP-B prime contractor. NASA Marshall Space Flight Center in Huntsville, Ala. Manages the program.



Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only














The content herein, unless otherwise known to be public domain, are Copyright 1995-2016 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service.