. 24/7 Space News .
Construction Begins On Vega Launch Pad At Kourou Spaceport

The future launch pad for Vega (ZLV - Zone de Lancement Vega) consists of dedicated components (mobile building and permanent infrastructure) that will be built on the civil foundations of the previous launch pad (ELA1 � Ensemble de Lancement Ariane 1) used for the successful Ariane1 launchers. Credits: ESA - J. Huart.

Kourou, French Guiana (ESA) Nov 05, 2004
The construction site for the ground segment of Vega, the small European launcher, was opened at Europe's Spaceport in Kourou, French Guiana last month. Vega is due to be launched at the end 2007 and will complement the European mid-class Soyuz and heavy-class Ariane 5 launchers.

The site was formally inaugurated on 20 October by ESA together with CNES and Italian company Vitrociset, prime contractor for the ground segment.

This is the start of a new life for ELA1, the launch pad originally used for the Ariane 1 European launcher, 15 years after its deactivation. The new launch pad (ZLV - Zone de Lancement Vega) is being built on the ELA1 foundations.

The choice of the Kourou Spaceport to build the new Vega ground segment infrastructure meets one of the main requirements of the Vega programme; namely to provide a high-quality launch service whilst limiting the cost by re-use of existing facilities and expertise.

Activities will start with the fencing of the area, the partial renovation of the bunker and waterproofing, metallic fixture installation, removal of the old ELA1 launch table, the installation of the 'evacuation chamber', set up of telecommunications network, as well as the refurbishment of the building that will be used for temporary lodging of personnel.

Prime contractor Vitrociset and its subcontractors will work with the support of local contractors, guaranteeing additional work for Europe's Spaceport and the companies involved.

The site is due for completion in April 2007, in time for Vega's qualification flight at the end of 2007. During the exploitation phase, from 2008, the Vega Launch Service will be then operated by Arianespace.

More about Vega's ground segment infrastructure

The Vega launch zone (ZLV), located on the old ELA1 site, comprises a permanent infrastructure (the bunker) and a mobile building (the gantry).

The bunker includes:

  • the launch table that ensures the launcher keeps its vertical position and that provides the interface with the exhaust duct
  • the umbilical mast that ensures the launcher and payload's conditioning and power supply until the very last moment before lift-off. It has to secure the correct disconnection of those systems from the launcher during lift-off.
  • the exhaust ducts through which the burning gases are expelled at ignition
  • four anti-lightning masts
  • various premises such as safety room, fluid room and gantry connection room

    The gantry, which is rolled back prior to the final countdown, provides composed of the infrastructure necessary for the integration of the Vega launcher, including:

  • hoisting devices for the erection of the stages
  • platforms to access to the different levels of the launcher
  • connection and supply facilities
  • propellant fuelling installations for the fourth stage, known as the Altitude and Vernier Upper Module (AVUM) or liquid propellant stage
  • safety systems

    The Launch Control Centre for Vega will be located in CDL3 (the control centre built for Ariane 5) which allows independent operational and monitoring systems dedicated to Vega, as shared components with Ariane.

    Vega will also benefit from shared use of the general facilities of the European Spaceport such as the satellite preparation area, Jupiter control centre for coordinating launch operations and facilities, storage sites, technical support services (transport, flight phase tracking, flight data processing for post-flight analysis, and meteorological data).

    Evolution of the launch pad

    Almost thirty years have passed since the initial launch pad built in the late 60s for the Europa 2 launcher was modified into ELA1 to meet the requirements of the first Arianes.

    Since then, two other ESA-funded launch pads, ELA2 and ELA3, have been built to support the later Ariane launchers. launchers. Today, only ELA3 - dedicated to Ariane 5 - remains in use.

    Related Links
    VEGA
    VEGA animation
    SpaceDaily
    Search SpaceDaily
    Subscribe To SpaceDaily Express



    Memory Foam Mattress Review
    Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
    XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


    Delta 4 Heavy Ready For Demonstation Launch
    Cape Canaveral (SPX) Nov 02, 2004
    America got its first look at the new, fully-stacked Delta IV Heavy launch vehicle on Oct. 27 when the mobile service tower rolled back at Space Launch Complex 37B.







  • SEDS-USA Revives Its National Student Space Conference
  • Measuring Cosmic Distances With Stellar Heart Beats
  • NASA Administrator Names New Chief Scientist
  • ESA Looking For More European Women For Toulouse WISE Bed-Rest Study

  • Spirit And Opportunity Still Pack A Full Toolkit 10 Months Later
  • Tithonium Chasma, Valles Marineris, On Mars
  • The Engineering Team Is Keeping Spirit Moving
  • British scientists announce successor to ill-fated Beagle Mars probe

  • Construction Begins On Vega Launch Pad At Kourou Spaceport
  • Delta 4 Heavy Ready For Demonstation Launch
  • Russia Plans Five New Space Launches
  • Russia Launches Telecoms Satellite From Kazakhstan

  • Northrop Grumman Helps Calibrate Aura Satellite
  • TRMM Satellite Proves El Nino Holds The Reins On Global Rains
  • Weather Hots Up Under Wind Turbines
  • Ball Aerospace Proud Of ERBS Spacecraft That Keeps Going And Going

  • New Horizons For Planetary Exploration
  • Outward To The Final Frontier Of Sol
  • Morning Planets Declare A New Dawn Sky
  • SWAP To Determine Where The Sun And Ice Worlds Meet

  • Stellar Survivor From 1572 A.D. Explosion Supports Supernova Theory
  • A Lunar Convergence: Eclipse & Return To The Moon
  • ESA's Hipparcos Finds Rebels With A Cause
  • Magnetic Star Mystery Solved

  • Europe's Smart-1 Ready For Lunar Capture Nov 15
  • On Course For Lunar Capture
  • Moon Shadows
  • Last Ion Engine Thrust Puts Smart-1 On Track For Lunar Capture

  • Nextel And Trimble Join Forces To Offer Mobile Phones For Navigation
  • Garmin Certifies GNS 480 for WAAS Precision Approaches
  • China Joins Galileo Project
  • Delphi First In USA With OEM Telematics For Dynamic Route Guidance

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement