. 24/7 Space News .
ATK Lockheed Martin And Rocketdyne Form Team To Compete For Ares I Upper Stage

The Ares CLV
by Staff Writers
Washington DC (SPX) Sep 14, 2006
Alliant Techsystems, Lockheed Martin, and Pratt and Whitney Rocketdyne have teamed together in preparation for NASA's Ares I Upper Stage procurement, planned for early 2007. The three companies have developed a complementary relationship, leveraging their strong experience and capabilities on NASA Human Space Flight programs to provide the Ares I project a springboard to minimize program costs, maintain aggressive development and test schedules, and reduce the technical risk going forward.

As a team, the three companies are natural partners for this upper stage effort because of the Ares I work already under way - and the interrelationships between those efforts. ATK is responsible for the Ares I first stage hardware, which includes the interface and separation with the upper stage.

Pratt and Whitney Rocketdyne is responsible for the liquid-fuel J-2x engine and related interfaces with the main propulsion system of the Ares I upper stage. And Lockheed Martin is providing the avionics for the early Ares I -1 test flight - and is a recognized industry expert on large cryogenic tanks that are essential to Ares I success.

Additionally, the team possesses unparalleled experience in system and subsystem design, development, manufacturing, integration, test, and risk management for human-rated hardware. The team members have participated in every U.S. human space flight program in some capacity throughout NASA's history. That experience, coupled with new state-of-the-art processes and technologies, will provide the necessary elements to meet the challenges that lie ahead.

"By combining our core competencies and working together in a seamless manner, along with our current roles on the Ares I program, we can significantly reduce integration issues and system complexity - and help NASA achieve the vision for Space Exploration at this critical point in the program," said Ron Dittemore, president of ATK Launch Systems Group.

"Each team member brings unique and complementary strengths and capabilities in the areas needed to ensure the success of NASA's vision of returning humans to the moon and going on to Mars," said John Karas, vice president of Human Space Flight for Lockheed Martin Space Systems Company.

"We have an excellent track record of working together as a team on such successful programs as the Space Shuttle, Titan IV and Atlas launch vehicles, as well as numerous defense programs."

"This team has a long and very successful history of working together in various forms throughout the history of the U. S. space program," said Byron Wood, president of Pratt and Whitney Rocketdyne. "The team members have had a presence in Huntsville and an active working relationship with the NASA Marshall Space Flight Center since its inception in 1960."

Related Links
Rocket Science News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


NASA Drop Test Proceeds Well For Ares I First Stage Booster
Huntsville AL (SPX) Sep 07, 2006
A CH-47 Chinook helicopter lifts a parachute drop test vehicle to an elevation of 10,000 feet above a Yuma, Ariz., test range as part of a series of tests that will aid in development of the booster recovery system for NASA's Ares I crew launch vehicle.







  • NASA Lands A Space On Monopoly
  • Russian Duma Rejects Madonna Space Holiday
  • First Malaysian Astronaut To Arrive In Russia In Late September
  • European Astrolab Mission Will Help Make Space a Safer Place

  • Peroxide Snow Hampers Search For Martians
  • Finishing Up Scuff Work And Heading For Emma Dean
  • NASA Mars Reconnaissance Orbiter Reaches Planned Flight Path
  • Animated Elevation Model Of Victoria Crater

  • Arianespace CEO Calls For New Pricing Regime
  • LM Announces Sale Of Its Interests In International Launch Services And LKEI
  • Call For Fair Pricing Policies In The Commercial Launch Services Industry
  • Eutelsat Confirms Sea Launch Agreements For 2008-9

  • Google Maps Spotlight Changes Across The Earth
  • Smoke Plume Dispersal From The World Trade Center Disaster
  • Acoustic Data May Reveal Hidden Gas And Oil Supplies
  • DMC International Imaging Wins 2nd Year Contract To Monitor Amazonian Rainforest

  • Pluto Gets A Six Digit Number
  • Myriad Planets In Our Solar System And Copernicus Smiled
  • CSEPR Examines Movement To Set Aside IAU Planet Definition Ruling
  • Unabashedly Onward to the Ninth Planet

  • Astronomers Trace The Evolution Of The First Galaxies In The Universe
  • Scientists Detect New Kind Of Cosmic Explosion
  • The Eternal Life Of Stardust Portrayed In New NASA Image
  • Cassiopeia A - The Colorful Aftermath Of A Violent Stellar Death

  • New Lunar Meteorite Found In Antarctica
  • Russia And China Could Sign Moon Exploration Pact In 2006
  • SMART-1 Impact Simulated In A Laboratory Sand-Box
  • Smart-1 Impact Flash And Debris: Crash Scene Investigation

  • Launch Of Second Galileo Test Satellite Delayed Until 2007
  • Topcon Launches All-New Robotic Surveyor Assistant
  • South Korea And EU Sign Galileo Satellite Cooperation Agreement
  • Uniden Enters Portable GPS Navigation Category

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement