Subscribe free to our newsletters via your
. 24/7 Space News .




ROCKET SCIENCE
ATK And NASA Complete Major Milestones For NASA Constellation Program
by Staff Writers
Minneapolis MN (SPX) Jan 28, 2009


File image.

In the last twelve months, Alliant Techsystems has completed several significant milestones for NASA's Constellation program that will set the stage for major flight and ground tests in 2009. The company successfully conducted sub-scale and full- scale ground tests of Constellation components.

It successfully concluded thrust oscillation testing, and developed hardware that will be critical to the development phase of the program. And importantly, it developed and delivered flight hardware to the Kennedy Space Center for this July's Ares 1-X flight test.

"The past 12 months has been a historical year for ATK as we successfully completed many firsts in the development of Ares I and the launch abort system for Orion," said Mike Kahn, ATK Launch Systems Executive Vice President and General Manager. "We look forward to continuing this outstanding progress in 2009, moving us closer to an operational program for Ares I."

During the past year ATK successfully conducted:

+ Five major ground tests including two shuttle booster motor ground tests, which collected data for Ares I

+ A separation test for Ares I-X

+ A full-scale launch abort motor test for the Orion crew exploration vehicle

These tests were in preparation for Pad Abort-1 and Ares I-X flight tests, as well as the ground test of the first five-segment motor for Ares I - all scheduled to be performed this year.

ATK also successfully completed the Stage 1 Preliminary Design Review (PDR) on Ares I, leading toward product development and manufacturing of the first five-segment Developmental Motor (DM-1) that will be tested this fall.

Major hardware was also completed and delivered to Florida for this year's Ares I-X flight test, including the new forward skirt extension and forward skirt.

ATK also completed numerous Ares Stage I recovery tests with the new parachutes that will be used on the Ares 1-X flight test. Finally, the solid rocket segments have been prepared for instrumentation and will be shipped to Kennedy Space Center in February in preparation for integration in the spring.

.


Related Links
ATK
Rocket Science News at Space-Travel.Com






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








ROCKET SCIENCE
The VSE Booster Switch
Honolulu HI (SPX) May 21, 2006
It's always amusing and sometimes frustrating to see NASA doing something I have suggested in these columns - usually after wasting millions of dollars and years of time on another option. Exactly that has happened with the boosters being designed as part of NASA's plan for manned missions to the Moon and Mars. Over two years ago I wrote about "Shuttle-derived" launch vehicles and concluded: "Any heavy-lift booster based on the failed technology of the Space Shuttle will certainly be too expensive and dangerous ... read more


ROCKET SCIENCE
Exploring The Eighth Continent

Rocketdyne Lunar Lander Test Engine Validates Capabilities

C1XS Catches First Glimpse Of X-ray From The Moon

We Will Have An Indian On The Moon By 2020

ROCKET SCIENCE
Opportunity Has A Post-Solar Conjunction Hangover

Mars polar water is pure: study

Satellite Antenna Enables Discovery Of Buried Glaciers On Mars

Martian methane, latest proof that 'Red Planet' is habitable?

ROCKET SCIENCE
Key Element Of NASA Orion CEV Capsule Test Program

CU-Boulder And SpaceDev Launch Center For Space Entrepreneurship

Global Trajectory Optimisation Competition

Successful Flight Of NASA Prototype Super-Pressure Balloon In Antarctica

ROCKET SCIENCE
China plans own satellite navigation system by 2015: state media

Fengyun-3A Weather Satellite Begins Weather Monitoring

Shenzhou-7 Monitor Satellite Finishes Mission After 100 Days In Space

China Launches Third Fengyun-2 Series Weather Satellite

ROCKET SCIENCE
Russia To Use Two Launch Pads At Baikonur For ISS Missions

Spacehab To Support Pre-Launch Preparations For Russian Module

Kogod Students Pioneer Branding Potential Of International Space Station

Russia Tests Phone Home To Santa Network

ROCKET SCIENCE
Arianespace Prepares For First Launch Of 2009

Arianespace Prepares For First Launch Of 2009

VINASAT-1 First Of Many Says Vietnam

One Launch Down, Twenty To Go For USAF In 2009

ROCKET SCIENCE
Helium Rains Inside Jovian Planets

Transit Search Finds Super-Neptune

First Ground-Based Detection Of Light From Transiting Exoplanets

New Study Resolves Mystery Of How Massive Stars Form

ROCKET SCIENCE
Japan's Fujitsu scraps HDD head business

IBM to cut more than 2,800 jobs: union

"Spore" computer game evolving

Academy Researcher Develops Satellite Imaging Technology




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement