10 reasons why solar PV installations should be tested regularly
by Staff Writers
Durham, UK (SPX) Nov 12, 2014


illustration only

Jim Wallace of Seaward Solar looks at the reasons why electrical testing and inspection of solar PV installations is a fundamental requirement for system safety and performance.

The safe operation of solar PV installations under both normal and fault conditions is an essential consideration at the system design stage to ensure that proper energy outputs and safety levels are achieved. Once in operation, it is important to ensure that the long term performance of the system is not compromised by sub-standard installation or poor maintenance.

In this respect, there are some key solar PV system features that rely on adequate and appropriate electrical testing and inspection being undertaken on a regular basis.

Compliance with IEC 62446
IEC 62446 recommends that periodic verification of an existing installation shall be performed. The standard defines the minimum requirements for system documentation, commissioning tests and inspection for PV systems. As such, this standard not only specifies the minimum electrical testing and inspection requirements but equally importantly how the inspection and test results are documented and supplied to the consumer after installation.

Where appropriate, the results and recommendations of previous periodic verifications shall be taken into account. A periodic verification report shall be provided and include a list of any faults and recommendations for repairs or improvements (such as upgrading a system to meet current standards).

Effective grounding
As with all electrical equipment, solar panels and their racking systems must be grounded to mitigate potential electric shocks and fire hazards. If the grounding system degrades over time, anyone who comes into contact with a metal piece of the system may receive a shock. While the likelihood of shock is low, should one occur, the chance of substantial injury is great, because of the high voltage arrays, and the added danger of falling from roof mounted systems.

Ground faults
PV systems, in particular large scale systems, have many metres of cabling, much of which is buried underground. Poor levels of insulation will allow energy generated by the PV system to leak to earth. This can be particularly problematic during damp or wet conditions where the insulation monitoring or residual current monitoring function within an inverter prevents the inverter from starting up which in turn can significantly reduce the operational efficiency of the PV installation.

Environmental degradation
PV systems by their very nature are exposed to the elements. Damage or corrosion to cabling and connectors caused by moisture ingress can result in degradation in performance or increased risk of fire. Regular electrical testing will enable system performance to be monitored and any necessary repairs or remedial actions to be taken

Surface contamination and physical damage
PV modules can become dirty or contaminated over time and this can reduce the operational efficiency and system performance. Similarly, exposure to the elements can result in physical damage to the component parts of a PV installation. Objects dropped by birds can result in physical damage to PV modules which may result in reduced output performance. Periodic electrical testing as part of regular maintenance will enable any problems to be identified and diagnosed.

Damage to wiring
The most obvious example of bad wiring is when wires hang below the panels and touch the roof or underlying vegetation. Eventually the wire coating will wear or be damaged by rodent attach and potentially expose the copper wires, presenting a shock hazard. Any deterioration of cable connections and wiring can be identified by applying regular electrical testing to identify potential faults.

Verification of system performance
The installation of solar PV systems is only undertaken after careful consideration of the costs involved and the potential return on investment provided by lower energy bills and FIT payments. As a result, the verification of system performance and energy output from the panels is particularly important. In many cases simple electrical faults or wiring failures can cause a serious inefficiency in the ability of the panel to produce power. Although proper metering will give an indication of system performance, periodic electrical testing is vital to verify ongoing functional performance over extended periods.

Warranty fulfilment
Periodic electrical testing of solar PV systems to identify and confirm continued safe operation and maximum energy output performance can be required as part of product warranties and PV system component guarantees.

Avoiding fire risks
As the number of rooftop solar installation systems have grown over the years, so have the number of reported incidents of fires. Household fires started by electrical faults in rooftop solar PV systems have been reported in the UK, Australia, the USA and France - among others. The periodic testing of the electrical cabling and components associated with solar PV systems will ensure the safe operation of the system and reduce the potential fire risk associated with any electrical faults.

Customer documentation
All solar PV installations require the provision of various documentation and forms to the customer. System documentation usually includes system data, installer details, electrical diagrams, operation and maintenance instructions and other information that may be required by certain standards or regulatory bodies. Copies of all test and commissioning data should also be provided and as a minimum this should include the results from the electrical safety and verification tests undertaken as part of the system installation procedures.


Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only


.


Related Links
Seaward Solar
All About Solar Energy at SolarDaily.com






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








SOLAR DAILY
New Materials Yield Record Efficiency Polymer Solar Cells
Raleigh NC (SPX) Nov 11, 2014
Researchers from North Carolina State University and Hong Kong University of Science and Technology have found that temperature-controlled aggregation in a family of new semi-conducting polymers is the key to creating highly efficient organic solar cells that can be mass produced more cheaply. Their findings also open the door to experimentation with different chemical mixtures that compri ... read more


SOLAR DAILY
After Mars, India space chief aims for the moon

China examines the three stages of lunar test run

China gears up for lunar mission after round-trip success

NASA's LRO Spacecraft Captures Images of LADEE's Impact Crater

SOLAR DAILY
Comet lander 'working well', but may be on slope

China Exclusive: China developing Mars rover

UI instrument sees comet-created atmosphere on Mars

Mars Orbiter MAVEN Demonstrates Relay Prowess

SOLAR DAILY
Weather delays Orion's move to launch pad, rescheduled for Tuesday

Google takes over NASA airport in Silicon Valley

Orion Hoisted Atop Delta 4 Launcher

Application of NASA Earth Science for Planning in African Union Nations

SOLAR DAILY
China publishes Earth, Moon photos taken by lunar orbiter

China plans to launch about 120 applied satellites

Mars probe to debut at upcoming air show

China to build global quantum communication network in 2030

SOLAR DAILY
Astronaut turned Twitter star, Reid Wiseman, back on Earth

Three-man multinational space crew returns to Earth

International Space Station astronauts put GoPro camera in a floating ball of water

ISS Agency Heads Issue Joint Statement

SOLAR DAILY
Soyuz Installed at Baikonur, Expected to Launch Wednesday

SpaceX chief Musk confirms Internet satellite plan

Orbital recommits to NASA Commercial program and Antares

Japanese Satellites Orbited as Part of Russia-Ukraine Program

SOLAR DAILY
Follow the Dust to Find Planets

NASA's TESS mission cleared for next development phase

ADS primes ESA's CHEOPS to detect and classify exoplanets

NASA's TESS Mission Cleared for Next Development Phase

SOLAR DAILY
New form of crystalline order good for thermoelectric uses

Supercomputing progress slows

Paris pop-up store immortalises shoppers with 3D printed figurine

How Satellite Laser Ranging Got its Start 50 Years Ago




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service.